Pre-demolition and pre-renovation asbestos survey

Before interior demolition or a gut renovation on an older building, a survey identifies suspect materials so they can be handled correctly instead of being disturbed blind.

Has this material been tested?

This is the first thing to establish. A material can't be safely priced for removal until a laboratory confirms whether it actually contains asbestos.

How it works

  1. 01

    Walk-through and material screening

    Suspect materials — textures, flooring and mastic, drywall compound, plaster, pipe and mechanical insulation — are identified and documented across the areas to be demolished.

  2. 02

    Representative sampling

    Samples are collected from the identified materials and analyzed so the demolition scope is based on lab results, not assumptions.

  3. 03

    Findings and scope documentation

    You receive a record of what was found and where, which informs the demolition plan, any required abatement, and disposal.

  4. 04

    Coordinated next steps

    If abatement is needed, it's scoped separately and completed before general demolition proceeds.

What to photograph before you call

Safety: Do not scrape, cut, sand, break, lift, sweep, or collect a sample yourself. Keep people away from any damaged material.

  • Whole room or area, photographed from a safe distance
  • Full coverage of the material in question
  • Condition and damage, using your camera's zoom rather than getting closer
  • Edges and transitions, without touching the material
  • Approximate room or area dimensions
  • Any existing lab report or designated substance survey

Common questions

Is a survey required before demolition?

For older buildings, identifying designated substances such as asbestos before disturbing materials is a standard and often legally required step. A survey lets the demolition proceed on documented information rather than guesswork.

What's the difference between a survey and a management plan?

A survey identifies what's present before a specific project. A management plan is an ongoing record for a building that stays in service — inventory, condition, and reassessment over time. Commercial property teams often need both at different points.