Toronto & the GTA
Asbestos, tested before it's touched.
Suspect material is confirmed by laboratory analysis before anyone disturbs it. Removal is only ever priced and planned against a real result — never a guess.
- Testing
- Laboratory analysis before anything is disturbed
- Phone
- Answered 24/7 by a person
- Insurance
- $5M general liability
- Workers
- Ministry-approved Type 3 asbestos training
- Technicians
- IICRC-certified
How to verify each of these — including how to check any contractor, not just us.
Has this material been tested?
This is the first thing to establish. A material can't be safely priced for removal until a laboratory confirms whether it actually contains asbestos.
Asbestos services
Testing & inspection
A visual inspection and, where needed, laboratory sampling to confirm whether a suspect material actually contains asbestos — before anyone disturbs it.
Popcorn ceiling removal
Textured 'popcorn' ceilings in older homes may contain asbestos. Testing comes first; controlled removal only follows a confirmed result and a scoped plan.
Pre-demolition survey
Before interior demolition or a gut renovation on an older building, a survey identifies suspect materials so they can be handled correctly instead of being disturbed blind.


What to photograph before you call
Clear photos help narrow the range and plan a safe first visit. Take them from a safe distance — never disturb the material to get a shot.
Safety: Do not scrape, cut, sand, break, lift, sweep, or collect a sample yourself. Keep people away from any damaged material.
- Whole room or area, photographed from a safe distance
- Full coverage of the material in question
- Condition and damage, using your camera's zoom rather than getting closer
- Edges and transitions, without touching the material
- Approximate room or area dimensions
- Any existing lab report or designated substance survey
Common questions
What does Ontario mean by Type 1, 2, and 3 asbestos work?
Ontario's asbestos regulation classifies work by how much disturbance and risk is involved. Lower-risk activities are Type 1; the most involved, higher-containment work is Type 3. The classification drives the controls, containment, and procedures required — and it's one reason accurate testing and scoping matter before pricing removal.
Should I test, or go straight to removal?
Test first whenever the material is suspect but unconfirmed. Removal can't be responsibly priced or planned without knowing whether asbestos is actually present and, if so, its type. A confirmed lab result is what turns a suspicion into a scoped, safe plan.
Do inspection fees count toward the work?
Yes. If you go ahead with us and the work comes to $2,500 or more, the base visual-inspection fee is credited against the price when the contract is approved and the deposit is paid within 30 days — so the inspection ends up costing you nothing. Laboratory analysis, sampling, emergency call-outs and extended travel are charged separately, because a lab invoices us for a sample whether or not the work goes ahead.
Not sure where to start?
A visual inspection is the safe first step. Book one, or call us directly.
Before you decide
Straight answers, no sales pitch.
- Asbestos floor tiles: what to know before you pull them upOld 9-inch floor tiles and the black adhesive under them often contain asbestos. Intact, they are low risk. The danger starts with the crowbar.
- How to tell if a popcorn ceiling has asbestosYou can't tell by looking — here's what actually determines the risk, and the one safe way to know for certain before you scrape.
- What actually drives the cost of asbestos removalNobody can quote asbestos removal from a photo, and a contractor who does is guessing. Here is what genuinely moves the number, so you can read an estimate and tell whether it is serious.
- Vermiculite in your attic: what to do (and what not to)Loose, pebbly grey-brown insulation in an older attic may be vermiculite, and much of it is contaminated with asbestos. The safest thing you can do is nothing — here is why.
- Do you need an asbestos survey before renovating?If the building predates the 1990s, the survey usually comes before the demolition — not because of paperwork, but because of what opening a wall releases.
More from Safeway
Insurance claims
How a claim works, and who decides what
Mold
Inspection, testing and remediation
Water damage
Extraction, drying and restoration
Fire & smoke
Soot, odor and restoration
Demolition
Selective and interior demolition
Cleaning
Post-construction and deep clean
Rebuild
Drywall, trim and painting after the work
Commercial
Recurring care for businesses