Skip to content

July 2026 · A school in the GTA

A school floor, tile by tile

Floor tile in older institutional buildings is one of the most common places asbestos still turns up. It is usually stable while it is intact — the problem starts when somebody lifts it.

School interior mid-abatement — lifted floor tile and fragments across the wood subfloor, window band along the wall
Before — tile coming up. School job, Safeway crew.

This one came up over a weekend so the building could be handed back before staff returned. Full enclosure, tile off, subfloor swept and cleared.

Long school floor cleared to clean wood boards after tile removal, exposed framing and joists beyond
After — the same room, same spot: floor cleared to the boards.

The two photos are the same room from the same spot, before and after. Not a different room made to look like a transformation — the same floor, later in the day.

More from the job · Or call 416-474-3978, answered by a person 24 hours.